London Hydro’s headquarters is a large building with a variety of means to connect to the grid. As a team, we designed and installed a 3-phase 208 V connected system in one part of the building, as well as a mutually exclusive single phase 240 V connected system located in their Innovation Centre.
List of Key Components
Limitations – The PV System Consists of: